Cost Tracking from the Jobsite: 10 Ways to Reduce Project Errors

It’s typically not until the end of the day at the construction site that the field personnel sit down to collect and enter all the time and expenses for their crews, equipment and other charges for that day.  It’s late and they are in a rush to get it done so it’s inevitable that mistakes are made. Things get coded to the wrong place, charges are missed, incorrect rates are used, etc.  All these errors are compiled, submitted and ultimately routed to the finance team for processing. And this is where the nightmare begins.

Finance is responsible for ensuring data accuracy in cost tracking before billing clients, paying vendors or routing charges through payroll. It’s not that site foreman can’t be detailed – it’s just that they have a very different spectrum of priorities. What this translates to, is that the finance team is tasked with finding and correcting data entry errors from the jobsite.

Read More
16 16, 2017

Which is it... LEM or a Daily Field Report?

Construction contractors are increasingly adopting technology to track their daily costs and activities from the jobsite. Some will refer to this as tracking their daily LEM – which stands for Labor, Equipment and Materials – however others may call it Field Data Capture; and some may call it the Daily Field Report, or Site Superintendent Report. Although we’ve adopted an industry term, “Construction Cost Tracking” as a general name to describe the activity and process, we tend to use “LEM” as the term that describes the final document(s) that contain all the jobsite data that gets tracked.

If you’re familiar with 4castplus at all, you’ll know that the system enables contractors to track much more than labor, equipment and materials. There’s clearly much more going on than that – so a “LEM” is just a term used that encapsulates the broad variety of everything that gets tracked. Other data that gets captured in the LEM includes: labor expenses like subsistence and meals; along with 3rd party vendor expenses; material field receipts; daily log and the weather. Field personnel can also input production quantities as progressed items that are completed. It also allows field personnel to upload any number of documents into organized document repository categories. There’s additionally a very powerful Vendor LEM option to track the costs and expenses from subcontractors.

Read More